? ? ? ?In June 2016, our company won the bid for Guangzhou China Resources Yuebao Cement's roller press energy-saving renovation project, which includes: Mechanical and electrical equipment installation, automatic instrument installation, process equipment and pipelines, non-standard and non-standard equipment production and installation, insulation engineering, ventilation pipelines and process pipeline installation, water supply and drainage and anti-corrosion engineering, power transformation and distribution equipment, electronic control equipment, lighting, lightning protection grounding, DCS system and single machine, linkage operation debugging, old equipment demolition, rotary kiln maintenance and cement mill renovation project.
Up to now, the demolition and installation of three sets of roller press systems, new cement blending systems, and old line clinker conveying and auxiliary material conveying systems contracted by our company have been completed and accepted. During this period, the peak number of construction workers in our company reached 210, and they worked day and night. Due to its strong construction force and excellent construction quality, it was finally recognized and praised by the owner, supervisor and general contractor.
